Sunday, March 28, 2010

Ireland Inspiration





Major Catch Up Part 2: The Kitchen

The ceiling came down. There was much debate about taking the whole mess down but John did it. We will gain a couple of inches and we can ensure it's all level, which it wasn't before. The way this house was built leaves much to be desired. John is constantly scratching his head in wonderment. Random shims and scrap wood make up the structure of our house. Awesome.

Supporting beam

POSITIVITY ALERT! The new Samsung microwave was installed over the oven with ventilation outside. It's like a beacon of light amongst the rubble.

Old insulation. Disgustin.

It's officially a non-functioning kitchen. GAME ON.

Major Catch Up Part 1: The Bathroom

After being lazy, a weeklong vacation, some work travel and BEING LAZY, I'm finally posting a new update on what we've done to the house.

I guess I can't really say I've been that lazy seeing as I decided to repaint the upstairs bathroom, replace all the fixtures, mirror, lighting, etc. Everthing went well except for the discovery of knob and tube wiring. Major oops. So, much to John's dismay, he had to put a temporary halt on the kitchen to rewire the entire upstairs. For those of you that think that John Linsley is laid back and even tempered. WRONG. Come over one day while he's doing a gut job or trying to manipulate a piece of teak. You'll see...

Anyway, this is the bathroom before. The blue isn't horrible, it just seems like a bathroom suited for a little kid so it was time to change it.
After

Before
After
Walls changed from blue to Sherwin-Williams Grecian White, new linen shower curtain, pictures rematted, all new fixtures, new handmade roman shade courtesy of directions from Little Green Notebook...
Before (but after I painted the vanity)
After
New light fixture from Target, with glass shades and silver tipped lightbulbs from Schoolhouse Electric.

We took the old mirror and John made a teak frame for it. It's my favorite part of the bathroom.